GOLD FIELDS RESULTS Q1F2007
Underground and surface
South African Rand and Metric Units
South African Operations
International Operations
Ghana Venezuela
Australia
Operating Results
Total Mine
Operations
Total
Driefontein
Kloof
Beatrix Total
Tarkwa
Damang
Choco 10
St Ives
Agnew
Ore milled / treated (000 ton)
- underground
September 2006
3,316
2,800 964
852 984
516
-
- -
396
120
June
2006
3,204
2,634 924
826 884
570
-
- -
458
112
- surface
September 2006
9,542
879
739 140
-
8,663
5,514 1,317
306 1,302
224
June 2006
9,447
980
814 166
-
8,467
5,381 1,302
348 1,224
212
- total
September 2006
12,858
3,679 1,703
992 984
9,179 5,514 1,317
306 1,698
344
June 2006
12,651
3,614 1,738
992 884
9,037 5,381
1,302 348
1,682 324
Yield (grams per ton)
- underground
September 2006
6.8
6.9
7.5 8.7
4.7 6.1
- -
-
4.4
12.0
June
2006
7.1
7.5
8.7 8.7
5.2 5.1
-
-
-
3.7
10.6
- surface
September 2006
1.1
1.0
1.1 0.9
- 1.2
1.0 1.1
1.8 1.6
1.8
June
2006
1.2
1.0
1.0 0.9
- 1.2
1.0 1.3
1.8 1.6
1.6
- combined
September 2006
2.6
5.5
4.7 7.6
4.7 1.4
1.0 1.1
1.8 2.3
5.4
June 2006
2.7
5.8
5.1 7.4
5.2 1.4
1.0 1.3
1.8 2.2
4.7
Gold produced (kilograms)
- underground
September 2006
22,449
19,287 7,228
7,423 4,636 3,162
-
- -
1,725
1,437
June
2006
22,718
19,825 8,044
7,187 4,594
2,893 -
- -
1,702
1,191
- surface
September 2006
10,834
907
781 126
-
9,927
5,399 1,508
504 2,112
404
June
2006
11,065
978
825 153
-
10,087
5,475 1,733
618 1,920
341
- total
September 2006
33,283
20,194 8,009
7,549 4,636
13,089
5,399 1,508
504 3,837 1,841
June 2006
33,783
20,803 8,869
7,340 4,594
12,980
5,475 1,733
618 3,622
1,532
Operating costs (Rand per ton)
- underground
September 2006
543
567
626 711
385 414
- -
-
398
466
June
2006
528
574
622 712
396 316
-
-
-
300
379
- surface
September 2006
101
64
63 72
-
105
78 108
228 180
139
June
2006
87
52
58 24
- 92
69 96
118
146
282
- total
September 2006
215
447
382 620
385 122
78 108
228 231
253
June 2006
199
433
358 596
396 106
69 96
118
188
315
Restated operating cost per ton on the assumption that the Ore Reserve Development (ORD) is fully expensed
South African Operations
International
Operations
Total Mine
Operations
Total
Driefontein
Kloof
Beatrix
Total
- underground
September 2006
612
650 715
814 445
414
June
2006
595
655 710
802 459
316
- surface
September 2006
101
64
63 72
0
105
June
2006
87
52
58 24
0 92
- total
September 2006
233
510 432
709 445
122
June
2006
216
491 405
672 459
106