Sign In  |  Register  |  About Mill Valley  |  Contact Us

Mill Valley, CA
September 01, 2020 1:29pm
7-Day Forecast | Traffic
  • Search Hotels in Mill Valley

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

Camino Granted Additional Drilling Permits at the Los Chapitos Project, Peru; Expands Permitted Area to 6,012 Hectares

VANCOUVER, BC / ACCESSWIRE / June 20, 2023 / Camino Corp. (TSXV:COR)(OTC PINK:CAMZF) (WKN: A116E1) ("Camino" or the "Company") is pleased to announce that it has received approval of the Evaluation of the Environmental Impact Study (EIA) for the Los Chapitos Copper Project ("Los Chapitos" or the "Project"). The Project area has been expanded to 6,012.50 hectares with the approval of the Modified Environmental Impact Study (MEIA), allowing Camino to target exploration drilling at the Lagunillas, Diva, and part of the Atajo copper mineralized structural trends that cumulatively extend over 20 km (Figure 1). The expanded permit allows for significant copper exploration over new areas of known copper mineralization with exploration partner Nittetsu Mining (see news release dated June 14, 2023).

Highlights:

  • Expanded EIA now includes 3 copper mineralized fault trends: Lagunillas, Diva and Atajo that cumulatively extend over 20km.
  • New Diana prospect with surface channel samples of 1.05% oxidized copper over 56 meters permitted for inaugural drilling.
  • Exploration work to commence under Nittetsu Mining partnership consisting of surface mapping, geophysics, and road building to access new drilling targets.

"Through a comprehensive EIA expansion process, we have opened up three copper mineralized trends to explore with our new partner, Nittetsu, at our Los Chapitos copper discovery", said Jay Chmelauskas, CEO of Camino. "Our goal is to connect new discoveries of oxide mineralization to add to our inventory at the Adriana Zone (see news release dated January 19, 2021) and Lourdes Zone (see news release dated September 7, 2022). We are now permitted to diamond drill the Diana outcrop with 1.05% Cu over 56 m at surface and explore for additional buried copper mantos that connect to the same copper mineralized trends."

Camino Minerals Corp., Monday, June 19, 2023, Press release picture

Figure 1. Location map of the Los Chapitos claims, and view of the extended EIA permitted area.

The extension of the EIA allows Camino to focus exploration strategies in the new structural Trends of Lagunillas and Atajo, which form a fault system parallel to the Diva Trend that host the Adriana and Lourdes copper discoveries. New targets, such as Diana (see news release dated February 8, 2023), Lagunillas, and Higos, have been identified in the Lagunillas Trend (Figure 2). In the Atajo Trend, previous diamond drilling has intercepted broad zones of copper mineralization (see news release dated December 6, 2017), and geochemical copper anomalies of greater than 1% copper at surface (Figure 2), provide geological potential for further discoveries (Figure 3).

Camino Minerals Corp., Monday, June 19, 2023, Press release picture

Figure 2. Exploration plan for targets along the Diva Trend (possible leached zones); and the Diana target.

Camino Minerals Corp., Monday, June 19, 2023, Press release picture

Figure 3. Location of the new targets and the exploratory potential covered by the EIA extension.

About Camino Corporation

Camino is a discovery and development stage copper exploration company. The Company is focused on advancing its high-grade Los Chapitos copper project located in Peru through to resource delineation and to add new discoveries. Camino has also permitted the Maria Cecilia copper porphyry project for a planned exploration drilling program. In addition, the Company has increased its land position at its copper and silver Plata Dorada project. The Company seeks to acquire a portfolio of advanced copper assets that have the potential to deliver copper into an electrifying copper intensive global economy. For more information, please refer to Camino's website at www.caminocorp.com.

Jose A. Bassan, MAusIMM (CP) 227922, MSc. Geologist, a Qualified Person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects, has reviewed and approved the technical information in this document. Mr. Bassan has reviewed and verified relevant data supporting the technical information, including sampling and analytical test data.

ON BEHALF OF THE BOARD

/S/ "Jay Chmelauskas"

President and CEO

For further information, please contact:

Camino Investor Relations
info@caminocorp.com
Tel: (604) 493-2058

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward Looking Statements: Certain disclosures in this release constitute forward-looking information. In making the forward-looking disclosures in this release, the Company has applied certain factors and assumptions that are based on the Company's current beliefs as well as assumptions made by and information currently available to the Company. Forward-looking information in the release includes the prospectivity of future exploration work at Los Chapitos. Although the Company considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect, and the forward-looking information in this release is subject to numerous risks, uncertainties and other factors that may cause future results to differ materially from those expressed or implied in such forward-looking information. Such risk factors include, among others, that actual results of the Company's exploration activities will be different than those expected by management, that the Company will be unable to obtain or will experience delays in obtaining any required approvals and the state of equity and commodity markets. Readers are cautioned not to place undue reliance on forward-looking statements. The Company does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law.

SOURCE: Camino Minerals Corp.



View source version on accesswire.com:
https://www.accesswire.com/762157/Camino-Granted-Additional-Drilling-Permits-at-the-Los-Chapitos-Project-Peru-Expands-Permitted-Area-to-6012-Hectares

Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Copyright © 2010-2020 MillValley.com & California Media Partners, LLC. All rights reserved.