Sign In  |  Register  |  About Mill Valley  |  Contact Us

Mill Valley, CA
September 01, 2020 1:29pm
7-Day Forecast | Traffic
  • Search Hotels in Mill Valley

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

HBM5 20hi Stack to Adopt Hybrid Bonding Technology, Potentially Transforming Business Models, Says TrendForce

TrendForce reports that the focus on HBM products in the DRAM industry is increasingly turning attention toward advanced packaging technologies like hybrid bonding. Major HBM manufacturers are considering whether to adopt hybrid bonding for HBM4 16hi stack products but have confirmed plans to implement this technology in the HBM5 20hi stack generation.

Hybrid bonding offers several advantages when compared to the more widely used micro-bumping. Since it does not require bumps, it allows for more stacked layers and can accommodate thicker chips that help address warpage. Hybrid-bonded chips also benefit from faster data transmission and improved heat dissipation.

TrendForce indicates that the three major manufacturers will continue to use Advanced MR-MUF and TC-NCF stacking architectures for the HBM3e 12hi stack and HBM4 12hi stack. Meanwhile, a clear preference for the HBM4 16hi stack and HBM4e 16hi stack has yet to emerge between hybrid bonding and micro-bumping as hybrid bonding currently lacks significant advantages over micro-bumping.

If manufacturers opt for hybrid bonding, it would likely be to master the learning curve of this new stacking technology early to ensure smoother mass production of HBM4e and HBM5 products in the future. Manufacturers have confirmed that hybrid bonding will be used in the HBM5 20hi stack generation after taking into consideration limitations on stack height, IO density, and thermal management.

However, hybrid bonding comes with several challenges. For instance, manufacturers investing in new equipment to introduce the technology would reduce their reliance on micro-bumping, thereby losing any accumulated advantages in that area.

Hybrid bonding also presents technical challenges—such as particle control—which could drive up unit investment costs. Additionally, hybrid bonding requires wafer-to-wafer stacking, which could lead to inefficiencies if front-end production yields are too low and make overall production economically unfeasible.

TrendForce notes that the adoption of hybrid bonding could lead to significant shifts in the HBM business model. It becomes critical to ensure that the base die and memory die have identical chip dimensions with wafer-to-wafer stacking. Since the design of the base die is primarily handled by GPU/ASIC companies, TSMC, which offers both base die and GPU/ASIC foundry services, could take on the responsibility of stacking the base die and memory die. Should this development occur, it could significantly impact HBM manufacturers’ role in base die design, stacking, and overall HBM order management—potentially reshaping the competitive landscape.

For further details of this press release, including the accompanying tables and figures, please visit:

https://www.trendforce.com/presscenter/news/20241030-12343.html

For additional insights from TrendForce analysts on the latest tech industry news, trends, and forecasts, please visit our blog at https://www.trendforce.com/news/

About TrendForce (www.trendforce.com)

TrendForce is a global provider of the latest development, insight, and analysis of the technology industry. Having served businesses for over two decades, the company has built up a strong membership base of 500,000 subscribers. TrendForce has established a reputation as an organization that offers insightful and accurate analysis of the technology industry through five major research departments: Semiconductor Research, Display Research, Optoelectronics Research, Green Energy Research, and ICT Applications Research. Founded in Taipei, Taiwan, in 2000, TrendForce has extended its presence in China since 2004 with offices in Shenzhen and Beijing.

TrendForce reports that HBM5 20-hi products will feature hybrid bonding by 2025, potentially revolutionizing business models in the DRAM industry!

Contacts

Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Copyright © 2010-2020 MillValley.com & California Media Partners, LLC. All rights reserved.