Sign In  |  Register  |  About Mill Valley  |  Contact Us

Mill Valley, CA
September 01, 2020 1:29pm
7-Day Forecast | Traffic
  • Search Hotels in Mill Valley

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

Fission Announces Winter Program to Advance Pls; Stakes New Uranium Property in Western Athabasca Basin

KELOWNA, BC Jan. 26, 2023 – FISSION URANIUM CORP. (” Fission ” or ” the Company “) is pleased to announce a winter program at its’ 100% owned PLS property in Canada’s Athabasca Basin region. The program will include geotechnical testing of key areas identified for surface infrastructure as identified in the Feasibility Study, including proposed stockpiles and mill locations. Also, 5 drill holes are designed to confirm groundwater modelling of certain sections of the R780E zone. Additionally, the company has staked a new, 11,148-hectare property in the western Athabasca Basin region of northern Saskatchewan . The West Cluff property is prospective for high-grade uranium and is located ~75km north of the Company’s flagship PLS project, and less than 3km west of the past-producing Cluff Lake mine.

PLS Project Winter Drill Program Highlights
  • 3 drill holes ( 300m ) at each stockpile location
  • 4 drill holes ( 300m ) at the mill location
  • 20 test pits for water table data and estimating boulder content for earthworks planning
  • 5 drill holes ( 730m ) on the R780E zone to confirm groundwater modelling

Ross McElroy , President and CEO for Fission, commented, ” With the superb results of our feasibility study now in hand, we will continue to develop our PLS uranium project at a strong, steady pace. As we move towards the Environmental Impact Statement, we will also be carrying out a number of work programs, including this new round of geotechnical drilling for the mine and mill facilities.”

Drill Program – Further Technical Details

Stockpiles. Previous drill holes for the feasibility study (“FS”) were drilled in the general area of the waste stockpiles to test suitability for waste storage. Now that the waste stockpiles are designed to FS level, based on the estimated waste volumes for PAG, non-PAG and overburden volumes, three additional holes are required within the footprint of each stockpile to confirm stratigraphy, and to update the stability analysis.

The PLS Mill . The mill area drill holes will be for Basic Engineering Design as previous drill holes were drilled in the general mill area, and data used to assess the suitability of the area for foundations. Now that the mill area has specific building locations, as per the FS, further drilling is required for foundation design.

Test Pits . The 20 test pits will gather information on perched water tables and estimating boulder content for earthworks planning. Six pits are proposed for the waste rock stockpile area (2 per stockpile), four pits are proposed in the mill area, and ten pits are proposed along the two main site access roads from the permanent camp to the mill area (6 pits) and from the mill area to the mine portal (4 pits)

R780E Zone Hydrogeologic Drilling . These holes will cover the hangingwall and footwall areas, and will consist of drilling 2 pumping wells and 3 VWP monitoring wells. The drilling is required to confirm the analysis completed for groundwater modelling for the underground mining plan developed for the Feasibility Study. Each well will test basement rock hydraulic conductivity, followed by an additional hydraulic conductivity test after pressure grouting. This will confirm the results of the groundwater modelling, and confirm the assumptions made for modelling where pressure grouting has been assumed for groundwater inflow mitigation during development.

West Cluff Project Staking Highlights
  • 11,148-hectare property in the re-emerging Western Athabasca Basin uranium district
  • Uranium mineralization encountered during prior exploration
  • Large databank of results from prior surveys, ground prospecting and reconnaissance drilling
  • Less than 3km west of past producing Cluff Lake mine
  • 250km north of the town of La Loche
  • All season access via government-maintained Highway 955

The highly prospective property covers both the margin and near margin western side of the Carswell Structure, in the Western Athabasca Basin district. The Carswell Impact Structure is a large, circular shaped section measuring ~18km in diameter, comprised primarily of the basement rock that underlies the Athabasca Basin sandstone formations.  A major geologic tectonic event, possibly related to a meteorite impact, resulted in the basement rock of the Carswell Structure being quickly thrust upwards for several hundred meters through the overlying Athabasca sandstones. The Carswell Structure is tectonically complex, with a number of ring faults surrounding the margin of the structure and a series of linear faults perpendicular to the ring faults within the basement structure, often expressing themselves as discrete Electromagnetic “EM” conductors.  High grade Athabasca Basin related uranium deposits are often associated with EM fault conductors, within hydrothermal altered rock, in a setting similar to the West Cluff property.

The major past producing Cluff Lake Mine (over 62 million pounds of uranium produced) is located on the southern edge of the Carswell Structure in a tectonically complex environment, similar to that interpreted on the West Cluff property and is within 3km of the property.

Fission Uranium - West Cluff Property, Saskatchewan (CNW Group/Fission Uranium Corp.)

The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed on behalf of the company by Ross McElroy , P.Geol., President and CEO for Fission Uranium Corp., a qualified person.

About Fission Uranium Corp.

Fission Uranium Corp. is a Canadian based resource company specializing in the strategic exploration and development of the Patterson Lake South uranium property – host to the class-leading Triple R uranium deposit – and is headquartered in Kelowna , British Columbia.  Fission’s common shares are listed on the TSX Exchange under the symbol “FCU” and trade on the OTCQX marketplace in the U.S. under the symbol “FCUUF.”

ON BEHALF OF THE BOARD

“Ross McElroy”
Ross McElroy , President and CEO

Cautionary Statement:

Certain information contained in this press release constitutes “forward-looking information”, within the meaning of Canadian legislation. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur”, “be achieved” or “has the potential to”. Forward looking statements contained in this press release may include statements which involve known and unknown risks and uncertainties which may not prove to be accurate. Actual results and outcomes may differ materially from what is expressed or forecasted in these forward-looking statements. Such statements are qualified in their entirety by the inherent risks and uncertainties surrounding future expectations. Among those factors which could cause actual results to differ materially are the following: risks related to the Offering, risks related to Fission’s limited business history, risks related to the nature of mineral exploration and development, discrepancies between actual and estimated mineral resources, risks related to uranium market price volatility, risks related to the market value of the common shares of Fission, risks related to market conditions, risks related to the novel coronavirus (COVID-19) pandemic, including disruptions to the Company’s business and operational plans, risks related to the global economic uncertainty as a result of the novel coronavirus (COVID-19) pandemic and other risk factors listed from time to time in our reports filed with Canadian securities regulators on SEDAR at www.sedar.com . The forward-looking statements included in this press release are made as of the date of this press release and the Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as expressly required by applicable securities legislation.

SOURCE Fission Uranium Corp.

Featured Image @ Depositphotos

Disclaimer

1) The author of the Article, or members of the author’s immediate household or family, do not own any securities of the companies set forth in this Article. The author determined which companies would be included in this article based on research and understanding of the sector.

2) The Article was issued on behalf of and sponsored by, Fission Uranium Corp. Market Jar Media Inc. has or expects to receive from Fission Uranium Corp.’s Digital Marketing Agency of Record (Native Ads Inc) one thousand five hundred USD for this article.

3) Statements and opinions expressed are the opinions of the author and not Market Jar Media Inc., its directors or officers. The author is wholly responsible for the validity of the statements. The author was not paid by Market Jar Media Inc. for this Article. Market Jar Media Inc. was not paid by the author to publish or syndicate this Article. The information provided above is for informational purposes only and is not a recommendation to buy or sell any security. Market Jar Media Inc. requires contributing authors to disclose any shareholdings in, or economic relationships with, companies that they write about. Market Jar Media Inc. relies upon the authors to accurately provide this information and Market Jar Media Inc. has no means of verifying its accuracy.

4) The Article does not constitute investment advice. Each reader is encouraged to consult with his or her individual financial professional and any action a reader takes as a result of the information presented here is his or her own responsibility. By opening this page, each reader accepts and agrees to Market Jar Media Inc.’s terms of use and full legal disclaimer as set forth here. This Article is not a solicitation for investment. Market Jar Media Inc. does not render general or specific investment advice and the information on PressReach.com should not be considered a recommendation to buy or sell any security. Market Jar Media Inc. does not endorse or recommend the business, products, services or securities of any company mentioned on PressReach.com.

5) Market Jar Media Inc. and its respective directors, officers and employees hold no shares for any company mentioned in the Article.

6) This document contains forward-looking information and forward-looking statements, within the meaning of applicable Canadian securities legislation, (collectively, “forward-looking statements”), which reflect management’s expectations regarding Fission Uranium Corp.’s future growth, future business plans and opportunities, expected activities, and other statements about future events, results or performance. Wherever possible, words such as “predicts”, “projects”, “targets”, “plans”, “expects”, “does not expect”, “budget”, “scheduled”, “estimates”, “forecasts”, “anticipate” or “does not anticipate”, “believe”, “intend” and similar expressions or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative or grammatical variation thereof or other variations thereof, or comparable terminology have been used to identify forward-looking statements. These forward-looking statements include, among other things, statements relating to: (a) revenue generating potential with respect to Fission Uranium Corp.’s industry; (b) market opportunity; (c) Fission Uranium Corp.’s business plans and strategies; (d) services that Fission Uranium Corp. intends to offer; (e) The Oregon Groups milestone projections and targets; (f) Fission Uranium Corp.’s expectations regarding receipt of approval for regulatory applications; (g) Fission Uranium Corp.’s intentions to expand into other jurisdictions including the timeline expectations relating to those expansion plans; and (h) Fission Uranium Corp.’s expectations with regarding its ability to deliver shareholder value. Forward-looking statements are not a guarantee of future performance and are based upon a number of estimates and assumptions of management in light of management’s experience and perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances, as of the date of this document including, without limitation, assumptions about: (a) the ability to raise any necessary additional capital on reasonable terms to execute Fission Uranium Corp.’s business plan; (b) that general business and economic conditions will not change in a material adverse manner; (c) Fission Uranium Corp.’s ability to procure equipment and operating supplies in sufficient quantities and on a timely basis; (d) Fission Uranium Corp.’s ability to enter into contractual arrangements with additional Pharmacies; (e) the accuracy of budgeted costs and expenditures; (f) Fission Uranium Corp.’s ability to attract and retain skilled personnel; (g) political and regulatory stability; (h) the receipt of governmental, regulatory and third-party approvals, licenses and permits on favorable terms; (i) changes in applicable legislation; (j) stability in financial and capital markets; and (k) expectations regarding the level of disruption to as a result of CV-19. Such forward-looking information involves a variety of known and unknown risks, uncertainties and other factors which may cause the actual plans, intentions, activities, results, performance or achievements of Fission Uranium Corp. to be materially different from any future plans, intentions, activities, results, performance or achievements expressed or implied by such forward-looking statements. Such risks include, without limitation: (a) Fission Uranium Corp.’s operations could be adversely affected by possible future government legislation, policies and controls or by changes in applicable laws and regulations; (b) public health crises such as CV-19 may adversely impact Fission Uranium Corp.’s business; (c) the volatility of global capital markets; (d) political instability and changes to the regulations governing Fission Uranium Corp.’s business operations (e) Fission Uranium Corp. may be unable to implement its growth strategy; and (f) increased competition.

Except as required by law, Fission Uranium Corp. undertakes no obligation to update or revise any forward-looking statements, whether as a result of new information, future event or otherwise, after the date on which the statements are made or to reflect the occurrence of unanticipated events. Neither does Fission Uranium Corp. nor any of its representatives make any representation or warranty, express or implied, as to the accuracy, sufficiency or completeness of the information in this document. Neither Fission Uranium Corp. nor any of its representatives shall have any liability whatsoever, under contract, tort, trust or otherwise, to you or any person resulting from the use of the information in this document by you or any of your representatives or for omissions from the information in this document.

7) Any graphs, tables or other information demonstrating the historical performance or current or historical attributes of Fission Uranium Corp. or any other entity contained in this document are intended only to illustrate historical performance or current or historical attributes of Fission Uranium Corp. or such entities and are not necessarily indicative of future performance of Fission Uranium Corp. or such entities.

Read more investing news on PressReach.com.Subscribe to the PressReach RSS feeds:

Follow PressReach on Twitter
Follow PressReach on TikTok
Follow PressReach on Instagram
Subscribe to us on Youtube

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Copyright © 2010-2020 MillValley.com & California Media Partners, LLC. All rights reserved.