Press Release Dated February 14, 2006
SECURITIES AND EXCHANGE COMMISSION
Washington, DC 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16 OF
THE SECURITIES EXCHANGE ACT OF 1934
From: February 14, 2006
IVANHOE MINES LTD.
(Translation of Registrants Name into English)
Suite 654 999 CANADA PLACE, VANCOUVER, BRITISH COLUMBIA V6C 3E1
(Address of Principal Executive Offices)
(Indicate by check mark whether the registrant files or will file annual reports under cover of
Form 20-F or Form 40-F.)
(Indicate by check mark whether the registrant by furnishing the information contained in this form
is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the
Securities Exchange Act of 1934.)
(If Yes is marked, indicate below the file number assigned to the registrant in connection with
Rule 12g3-2(b): 82- .)
Enclosed:
Press release
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused
this report to be signed on its behalf by the undersigned, thereunto duly authorized.
|
|
|
|
|
|
IVANHOE MINES LTD.
|
|
Date: February 14, 2006 |
By: |
/s/ Beverly A. Bartlett
|
|
|
|
BEVERLY A. BARTLETT |
|
|
|
Corporate Secretary |
|
|
February 14, 2006
NEW ESTIMATE UPGRADES MEASURED AND INDICATED COAL
RESOURCES AT NARIIN SUKHAIT PROJECT, SOUTHERN MONGOLIA
IVANHOE LOOKS TO CREATE A STAND-ALONE PUBLICLY-LISTED
MONGOLIAN COAL AND POWER COMPANY
ULAANBAATAR, MONGOLIA Gene Wusaty, Ivanhoe Mines President, Coal Division, and John Macken,
Ivanhoes President, announced today that the company has received an updated resource estimate for
its Nariin Sukhait Coal Project in southern Mongolia.
The new estimate, independently prepared by Norwest Corporation of Salt Lake City, Utah, has
upgraded the measured and indicated coal resources to approximately 124 million tonnes, with an
additional inferred coal resource of approximately 34 million tonnes.
Updated In-Place Coal Resources Summary for Nariin Sukhait
As of October 30, 2005
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Area |
|
|
ASTM |
|
|
In-Place Resources (Tonnes) |
|
|
|
|
|
Group |
|
|
Measured |
|
|
Indicated |
|
|
Inferred |
|
|
South-East Field |
|
|
High Volatile |
|
|
|
38,822,000 |
|
|
|
|
13,828,000 |
|
|
|
|
12,412,000 |
|
|
|
West Field |
|
|
Bituminous |
|
|
|
40,663,000 |
|
|
|
|
30,677,000 |
|
|
|
|
21,346,000 |
|
|
|
Total |
|
|
123,990,000 |
|
|
|
33,758,000 |
|
|
|
The updated resources reflect a gain of 6.9% in the measured plus indicated categories and a
reduction of 18% in the inferred category.
The resources, which were delineated by a total of 212 drill holes, are considered to be of
immediate interest as surface open-pit deposits that are amenable to near-term production for
potential buyers in domestic and export markets. Drilling between August 9th and the end of the
2005 exploration program on October 30th was focused on in-fill holes that enabled
further refinement of resource estimates and geologic interpretation of the coal fields.
Mr. Wusaty also announced that Ivanhoe is looking to separate the coal assets from the companys
core copper and gold assets and create a stand-alone, publicly-listed coal and power company. The
decision follows an extensive strategic review with the companys external advisors on measures to
strengthen the companys overall business and increase shareholder value.
Separating businesses within an organization that have different capital requirements and
operating characteristics can be a prudent way to unlock shareholder value, said Mr. Wusaty. We
expect that a stand-alone coal company will attract a wider following among analysts and investors,
while also allowing Ivanhoes management to focus on, and free up capital for, the companys core
copper and gold assets.
2
The Nariin Sukhait coal deposits are in the southwest corner of the Omnogovi Aimag (Province),
located in the southern Gobi area of Mongolia. The deposits are within the Gurvantes Soum, 320
kilometres southwest of the provincial capital of Dalanzadgad and 950 kilometres south of the
nations capital of Ulaanbaatar. The Ivanhoe-controlled Nariin Sukhait property surrounds, and is
adjacent to, the existing Nariin Sukhait Mine, owned and operated by the MAK-Qin Hua
Mongolian/Chinese Joint Venture (MAK). The MAK operation currently consists of two open-pit mines
on its 28.8-square-kilometre mining license. The Ivanhoe property consists of seven exploration
licences that cover an area of 3,240 square kilometres. The project is approximately 40 kilometres
north of the Mongolia-China border and the shipping terminus for a newly constructed, 450-kilometre
Chinese rail line. A railway line from the Mongolia-China border to the Nariin Sukhait Mine area
is being evaluated.
Intermittent coal outcrops of Late Permian-age occur along a strike-length of 90 kilometres in the
upper plate sequence of an arcuate, east-west trending thrust fault, the dominant structural
feature of the basin. Exploration programs have identified 10 coal seams at Nariin Sukhait. Total
thickness for the coal-bearing sequence is approximately 1,370 metres, with a total coal thickness
ranging from 68 metres to 250 metres. Ivanhoes exploration has been focused on identifying
resources in seams above, and including, the No. 5 Seam the thickest seam within the
coal-bearing sequence.
Since beginning exploration at Nariin Sukhait in February 2005, Ivanhoe has been using a
multi-faceted approach in its exploration program, employing field mapping, surface resistivity
geophysics, trenching and drilling to identify coal resources.
In-place coal resources previously had been defined in three distinct areas at Nariin Sukhait, the
South, East and West fields (see Ivanhoes October 13, 2005 news release). Additional drilling has
led to reinterpretation of the geology of the South and East fields. The two fields have been
merged into a larger, single field now known as the South-East Field. The South-East Field is
directly adjacent to the East Pit, currently being mined for No. 5 Seam coal by the MAK operation.
In the western portion (formerly South Field) of the field, the No. 5 seam projects down-dip from
the East Pit as a single seam composed of multiple benches separated by narrow rock partings. In
this part of the field, the No. 5 seam has an average thickness of 38.2 metres and is dipping at
45° to the south.
The West Field is located 6.5 kilometres west of the South-East Field, adjacent to and south of the
MAK mining licence. The field is approximately 1.6 kilometres southwest of the MAK West Pit. A
total of 88 drill holes have defined a measured and indicated resource of 71.3 million tonnes in
the West Field. Along the southeast limb of the antiform, drilling has intersected seams Nos. 5
through 10 in strata dipping from 45° to 60° toward the southeast. Drilling has intersected Seams
Nos. 7 through 10 dipping south-southwest at approximately 35°. The No. 5 Seam averages 36.4 metres
thick along the southeast limb. The upper seams for the southeast limb have a combined average coal
thickness of 12.1 metres. The upper seams on the northwest limb have a combined coal thickness
averaging 16.5 metres.
Proximate and thermal testing has been completed for samples from 36 core holes and 45 reverse
circulation drill holes. At this time, washability tests have been completed for samples from 26
drill holes and metallurgical tests have been completed for samples from 21 drill holes. Quality
testing of the seams in both fields ranks the Nariin Sukhait coals as high-volatile bituminous
under ASTM standards. Tests indicate that some of the No. 5 Seam in the West Field is high-rank,
low-ash, low-sulphur coal that is suitable for making a high-volatile metallurgical blend.
3
Development study underway
Based on the October 30, 2005, geological model for Nariin Sukhait, Norwest has begun work on
mining studies of the West and Southeast deposits. Completion of an initial mining study is
anticipated next month, with more advanced studies to be completed when additional field data
becomes available. The coal is expected to be mined by conventional open-pit truck/shovel methods.
Geotechnical, hydrogeological and additional exploration drilling is scheduled for this spring and
summer that will further define the resources and support the mine design. Ivanhoe and Norwest are
currently evaluating a mine design that will support an operation capable of producing four million
tonnes saleable coal per year.
A Detailed Environmental Impact Assessment (DEIA) is being carried out by ENCO, of Mongolia and
also is scheduled to be completed next month. Ivanhoe has entered into discussions with potential
Chinese customers interested in coal supply from Nariin Sukhait.
Based on actual market information from the adjoining MAK-Qin Hua Mongolian/Chinese Joint Venture
(MAK) and discussions with potential customers in China, Ivanhoes Nariin Sukhait mine is expected
to produce three coal products:
|
1. |
|
Thermal coal for power generation;
|
|
2. |
|
PCI coal for steel making; and |
|
3. |
|
Coking coal for blending. Although this coal is blended at a low percentage in coking
plants in China, scheduled testing will establish the coals optimum coking
characteristics. |
Tsagaan Tolgoi coal deposit
Ivanhoes Tsagaan Tolgoi coal deposit is located 115 kilometres west of Ivanhoes Oyu Tolgoi copper
and gold project and 113 kilometres southeast of the provincial capital of Dalanzadgad and
approximately 100 kilometres north of the Mongolia-China border. In 2004, geologic mapping,
trenching, open-hole and core-hole drilling were conducted on the property. A baseline system of
drilling was employed with drill lines spaced on approximate 400-metre centres. A total of 46 holes
were drilled. Data along each of the lines typically consist of an exploration trench and/or the
identification of the coal seam in outcrop, and down-dip drill holes piercing the seam. Initial
drilling indicates the following average coal quality characteristics:
In-Situ Coal Quality at Tsagaan Tolgoi (Norwest Dec. 2004). As Received Basis
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Average |
|
|
|
|
|
|
|
|
|
|
|
|
|
Calorific |
Seam |
|
Thickness |
|
Moisture% |
|
Ash% |
|
Sulfur% |
|
Value |
|
|
(metres) |
|
|
|
|
|
|
|
|
|
|
|
|
|
(kcal/kg) |
1L |
|
|
16.39 |
|
|
|
9.22 |
|
|
|
32.80 |
|
|
|
0.65 |
|
|
|
4,440 |
|
1U |
|
|
12.74 |
|
|
|
9.24 |
|
|
|
29.04 |
|
|
|
0.65 |
|
|
|
4,798 |
|
3 |
|
|
5.77 |
|
|
|
17.55 |
|
|
|
16.24 |
|
|
|
0.61 |
|
|
|
5,145 |
|
4L |
|
|
4.92 |
|
|
|
13.10 |
|
|
|
9.48 |
|
|
|
0.75 |
|
|
|
6,096 |
|
4U |
|
|
6.31 |
|
|
|
12.97 |
|
|
|
13.70 |
|
|
|
0.58 |
|
|
|
5,746 |
|
5 |
|
|
5.64 |
|
|
|
12.56 |
|
|
|
15.21 |
|
|
|
0.53 |
|
|
|
5,545 |
|
Total |
|
|
|
|
|
|
10.55 |
|
|
|
24.75 |
|
|
|
0.62 |
|
|
|
4,785 |
|
The drilling successfully intercepted significant thicknesses of coal along a strike length of
approximately six kilometres. However, the drill-hole density was not sufficient to provide an
estimate of resources in accordance with National Instrument 43-101. Ivanhoe will conduct
4
an infill drilling program this spring to provide sufficient drill-hole density for a resource
estimate.
Ivanhoe has retained Norwest Corporation and Crescent Technology Inc., of New Orleans, Louisiana,
to carry out initial stage studies on mining and power generation opportunities at Tsagaan Tolgoi.
Ivanhoes objective for its exploration and development program at Tsagaan Tolgoi is to delineate a
sufficient quantity of thermal coal to supply a major, long-life, coal-fired generating plant to
supply electricity to the Oyu Tolgoi Project and the residents in the sparsely populated southern
part of Mongolia.
2006 coal drilling and exploration program
Ivanhoes 2006 coal exploration and drilling program is scheduled to begin in March. The program
will focus on:
|
|
|
Nariin Sukhait mine infill drilling. |
|
|
|
|
Nariin Sukhait mine area geotechnical holes. |
|
|
|
|
Nariin Sukhait mine area hydrogeology holes. |
|
|
|
|
Nariin Sukhait bulk sampling program for advanced metallurgical and coal quality testing
in North American and Chinese laboratories. |
|
|
|
|
Tsagaan Tolgoi infill and exploration drilling. |
|
|
|
|
Field reconnaissance of South Gobi targets, trenching and exploratory drilling that will
target more than 12 coal outcrops already identified within approximately 50 kilometres of
Nariin Sukhait. |
Qualified Person
Steven B. Kerr, Senior Geologist with Norwest Corporation and a Qualified Person as defined by NI
43-101, has reviewed and approved the technical and scientific information contained in this
release.
In accordance with NI 43-101, Norwest has used the referenced document, the Canadian Institute of
Mining, Metallurgy and Petroleums CIM Definition Standards on Mineral Resources and Reserves
adopted by CIM Council on November 14, 2004, and referenced the Geological Survey of Canada Paper
88-21, A Standardized Coal Resource/Reserve Reporting System for Canada (GSC Paper 88-21) during
the classification, estimation and reporting of coal resources for the Nariin Sukhait property. The
coal samples reported in the release were analyzed at the SGS Beckley, West Virginia, laboratory.
Ivanhoe has a 100% interest in the Oyu Tolgoi gold and copper project in Mongolia and owns or
controls exploration rights covering approximately 135,000 square kilometres in central and
southern Mongolia, where additional copper-gold and coal discoveries have been made. Ivanhoe
produces LME grade A copper from its Monywa joint venture in Myanmar.
Ivanhoe shares are listed on the Toronto, New York and NASDAQ stock exchanges under the symbol
IVN.
Information contacts in North America
Investors: Bill Trenaman: +1.604.688.5755 / Media: Bob Williamson: +1.604.688.5755
5
Forward-Looking Statements: This document includes forward-looking statements.
Forward-looking statements include, but are not limited to, statements concerning Ivanhoes planned
coal exploration and development program, pre-feasibility studies and planned mining, and other
statements that are not historical facts. When used in this document, the words such as could,
plan, estimate, expect, intend, may, potential, should, and similar expressions are
forward-looking statements. Although Ivanhoe Mines believes that its expectations reflected in
these forward-looking statements are reasonable, such statements involve risks and uncertainties
and no assurance can be given that actual results will be consistent with these forward-looking
statements. Important factors that could cause actual results to differ from these forward-looking
statements are disclosed under the heading Risk Factors and elsewhere in the corporations
periodic filings with Canadian and US securities regulators.